Drilling rig ÒD 225 DE quickly installable

  The Generation Industrial Group
Ðóññêèé Sitemap Faq
 
 
Hook load capacity, kN (òñ) 2250(225)
Conditional drilling depth, m 3900
Drive type electrical
Drive capacity, kV: hoist capacity 630
rotor capacity 500
pump capacity 2 õ 630
Hook speed, m/s 0 ... 1,57
Derrick ÂÌÎ-49 × 225 with opened front side
Height of the derrick, m 49
Ultimate derrick height, m 41,7
Basement Self-lifting
Height of the basement (from ground to the floor of drilling floor/up to support beams), m 8,5 / 6,5
Hoist 080 DWP - 3
Rotary swivel UV-250
Crownblock UKB-6-250
Block hook UTBK-5-225
Rotary table Ð-700
Mud pump UNBT 950 L× 2 it.
Overall liquid total, m3 200
Amount of purification stages 4

Usage

This rig is intended for drilling of development wells for oil and gas with conditional depth 3900 m.

It has all the merits of fixed machines, quickly installable drilling rigs has several advantages presented below:

  • Rapid installation;
  • Convenient shipment because of weight reduction and module dimensions; 
  • Installation without using of building cranes; 
  • Installation on limited cluster sides; 
  • Possibility of transportation of loose modules by aircraft transport.

Components

  • Derrick unit;
  • Drawworks unit; 
  • Modular slush pump; 
  • Treatment unit, storage, processing, utilization and mortar preparation; 
  • Compressor unit; 
  • Power generating unit; 
  • Mechanized receiving bridge; 
  • Rail track; 
  • Additional metalware; 
  • Boiler house; 
  • Oil and water tank; 
  • Sectional communications.
Drilling rig can be supplied in complete package, mentioned by the customer.

Platform and basement lean on two ground supporting beams. Platform installation is made sectionaly with the help of special mounting arrangement, which is a platform’s component, and two catworks with carrying capacity 50 kN. Platform sections are put into the base together with mounted ladders and attics.

The basement is spread like parallelogram with the help of two catworks.

Height from floor to drilling platform is 8,5 m, overhead clearance for blowout preventer is not less 6,5 m.

Electrical drive of the main joints can be done on the basis of:

  • Direct current motor;
  • AC motor with frequency regulation.

    Shipment of drilling rigs is provided with rail modes and motor transport. First assembly and setting of all drilling rigs is carried out at presence of supervisor.

    Services:

    • Contract supervision, electrical mounting, starting-up and adjustments of drilling rig;
    • Personnel training of the customer to work on new equipment; 
    • Tracking of the pioneer well.

     

© 2008 "The Generation Industrial Group".
SiteActiv